H₂S Seawater Treatment — 42" MJTNG-1 Pipeline
A higher-capacity sulfide-treatment system for the seawater used to flood the 42-inch MJTNG-1 pipeline — 1,000 m³/hr, 50,000 m³ total — with a full on-site lab monitoring sulfide throughout.
An integrated high-capacity dosing system for sulphide treatment of seawater used to flood the 42" MJTNG-1 pipeline, processing 50,000 m³ at 1,000 m³/hr with a full on-site laboratory for continuous sulphide monitoring throughout the flooding procedure.
FK & Partner Co. and Water Technology Company (W-Tech) supplied an integrated sulfide-scavenger dosing system with activated-carbon odour control, processing 50,000 m³ at 1,000 m³/hr, and ran a full-scale laboratory to monitor sulfide levels during the flooding procedure.
A larger 42-inch line flood needs sulfide dosing at double the flow of phase 1, with continuous verification that levels stay controlled throughout the operation.
- 42-inch line flooding
- 1,000 m³/hr — double phase 1
- Continuous sulfide verification
A treatment train sequenced to the contaminants.
Dosing pumps inject sulfide scavenger into the seawater stream; activated carbon controls odour; and a full-scale on-site laboratory verifies sulfide levels in real time throughout the flooding procedure.
| Equipment / parameter | Application / value |
|---|---|
| Dosing Pumps | Chemical injection |
| Sulfide Scavenger | Sulphide treatment |
| Flow rate | 1,000 m³/hr |
| Total volume | 50,000 m³ |
| Capacity | 1,000 m³/hr (50,000 m³ total) |
| Project type | Integrated dosing system + on-site lab |
High-capacity dosing at 1,000 m³/hr
On-site lab for continuous sulphide monitoring
Activated carbon for odour control
Verified post-commissioning performance figures (achieved effluent, throughput, uptime) to be confirmed — see CONTENT_GAPS.