FK & PARTNER CO. — EASTERN PROVINCE, KSA26.2172° N · 50.1971° E
Water & wastewater treatment engineering

Design the plant that cleans your water.

FK & Partner Co. designs, builds, and operates industrial and municipal treatment plants across Saudi Arabia — backed by 17 delivered projects and four integrated divisions under one roof.

FOUNDED
2012
PROJECTS
17
DIVISIONS
04
BASE
Al-Khobar
Trusted by Saudi AramcoKing Fahad Causeway AuthorityJazan MunicipalityEst. 2012
01 / About the company

A civil contractor that became a water treatment engineering house.

FK & Partner Co. was founded in 2012 in Al-Khobar and Dammam as a civil and infrastructure contractor. As industrial clients increasingly needed effluent treated to regulatory standard, the firm's centre of gravity shifted — first into electro-mechanical works, then into full process engineering for water and wastewater. What began as a sideline is now the core of the business.

Today we operate through four integrated divisions — water treatment systems, electro-mechanical works, operation & maintenance, and civil infrastructure. Because all four sit under one roof, a plant can be designed, built, and run without the handover gaps that appear when separate contractors own separate scopes.

Our philosophy is deliberately unglamorous: we do not promise what we cannot measure. Every plant is handed over with documented discharge parameters, traceable commissioning data, and an O&M plan that keeps it inside spec long after the ribbon is cut.

MILESTONES
2012
Established in Al-Khobar / Dammam as a civil & infrastructure contractor.
2015
Expanded into electro-mechanical works and plant O&M for Saudi Aramco facilities.
2016
Khurais 9,000 m³/day nano-filtration plant started up under BOO.
2019
KFCA causeway MBBR plants and JTTF industrial BOO delivered.
2024
Jizan Refinery treatment facilities and 17th project delivered.
17
projects delivered across industrial WWTP, sanitary & O&M
14
years of continuous engineering since 2012
4
integrated service divisions under one roof
3
principal clients: Aramco, KFCA, Jazan Municipality
02 / Why FK & Partner

Four reasons clients keep the contract.

01

Single accountable team

Design, mechanical, civil, and operations sit in one company. There is no finger-pointing across contracts when a plant under-performs — one team owns the discharge result end to end.

Evidence: JTTF industrial plant delivered turnkey — civil, E-M and process by one team.
02

Operated, not just handed over

We run plants under long-term O&M, so our designs are shaped by what actually breaks at 03:00. Maintainability, spare-part logistics, and operator ergonomics are designed in, not bolted on.

Evidence: KGP plant operated under O&M 2015–2017 to SAES-104 standard.
03

Built for Gulf conditions

High influent temperatures, saline groundwater, and 45 °C summers change how biology and membranes behave. We compensate aeration and select corrosion-rated materials for the Eastern Province, not for a temperate textbook.

Evidence: SS-316 seawater-duty strainers at Ain Dar SRF (92,000 m³/day).
04

Engineered with named partners

For specialist process and detailed design we work with IE-Consult and W-Tech Co. Independent engineering review sits behind the plants we sign off — not marketing, peer scrutiny.

Partners: IE-Consult · W-Tech Co.
03 / Capabilities

Four divisions, one accountable team.

D-01

Water treatment systems

Process design and construction of industrial and municipal water and wastewater plants — DAF, MBBR, MBR, clarification, filtration, and disinfection trains sized to the influent.

D-02

Electro-mechanical works

Pumps, blowers, dosing skids, MCC and control panels, instrumentation and SCADA — the machinery and controls that make a process plant actually run.

D-03

Operation & maintenance

Long-term plant operation, preventive maintenance, lab monitoring, and compliance reporting — keeping discharge inside permit limits year after year.

D-04

Civil infrastructure

Reinforced concrete tankage, pump stations, pipe networks, and site works — the structural backbone, built by the contractor we started as.

04 / Engineering calculator

Size a plant for your effluent.

Enter your flow, organic load, target standard, and water temperature. We suggest a treatment train and estimate tank volume, retention time, oxygen demand, and a Gulf-climate aeration correction.

Target standard
RECOMMENDED TREATMENT TRAIN
TANK VOLUME
RETENTION (HRT)
h
OXYGEN DEMAND
kg O₂/d
CLIMATE FACTOR
×
BLOWER AIR
m³/h
BOD REMOVAL
%

* Indicative engineering estimate for early scoping only — not a stamped design. Final sizing follows a site survey and mass balance.

05 / Solution configurator

Find your solution in four steps.

Answer four quick questions and we'll point you to the right division and approach — then send it straight into a pre-filled enquiry.

06 / How we work

From first inquiry to commissioning.

01

Inquiry & site survey

We characterise the influent, flow profile, footprint, and discharge target on site before proposing anything.

02

Process design & proposal

Mass balance, unit-process selection, and a costed proposal — reviewed with our engineering partners.

03

Civil & fabrication

Concrete tankage and structures built, skids and panels fabricated and factory-tested.

04

Installation & integration

Mechanical, electrical, and control systems installed and wired into a single SCADA layer.

05

Commissioning & O&M

Seeded, tuned, and proven against discharge limits — then operated under a maintenance contract.

07 / Services in depth

What each division actually delivers.

Water treatment systems

Industrial wastewater treatment plants (WWTP)
Sanitary / municipal sewage treatment
Tertiary treatment & reuse for irrigation
DAF, MBBR, MBR & UV process trains

Electro-mechanical works

Pumping stations & dosing systems
Blowers, aeration & DO control
MCC, control panels & instrumentation
SCADA integration & remote monitoring

Operation & maintenance

Full plant operation contracts
Preventive & corrective maintenance
Laboratory monitoring & compliance reports
Spare-parts management & uptime SLAs

Civil infrastructure

Reinforced-concrete tanks & basins
Pump stations & wet wells
Pipe networks & site works
Civil rehabilitation of existing plants
08 / Projects portfolio

Seventeen delivered projects.

Industrial wastewater, sanitary plants, and long-term operation across the Kingdom — the majority for Saudi Aramco.

SHOWING 17/17
Industrial WWTP2019
Industrial Wastewater Treatment Plant BOO — JTTF

Industrial Wastewater Treatment Plant BOO — JTTF

CLIENTSaudi AramcoCAPACITY500–1,000 m³/dayTECHNOLOGYGalaxie Separator → Electro-coagulation → DAF → Lamella Settler → UV AOP → Self-cleaning FilterLOCATIONJuaymah Terminal Tank Farm (JTTF)

A build-own-operate plant treating evaporation-pond wastewater to marine-discharge standard. After a successful first 250 m³/day line, FKP added an identical second line within a month without interrupting operations — over 300,000 m³ treated in total.

Electro-coagulation cuts DAF chemical use
UV advanced-oxidation polishing
Second line added in one month, no downtime
View project
Sanitary / Municipal
Centralized Sewage Treatment Plant BOO — Jazan Economic City

Centralized Sewage Treatment Plant BOO — Jazan Economic City

CLIENTSaudi AramcoCAPACITY5,000 m³/dayTECHNOLOGYScreening → Equalization → Activated Sludge → Clarifier → ChlorinationLOCATIONJazan Economic City (Baish)

A centralized domestic wastewater plant receiving tanker-truck inputs from Aramco contractor camps, treating 5,000 m³/day via an activated-sludge process with full sludge management. Fully automated by PLC with 24/7 online monitoring and remote alarms.

Activated-sludge biological reactor
Full sludge drying-bed system
24/7 PLC online monitoring & alarms
View project
Industrial WWTP2016
9,000 CMD Nano-Filtration Plant BOO — Khurais

9,000 CMD Nano-Filtration Plant BOO — Khurais

CLIENTSaudi AramcoCAPACITY9,000 m³/dayTECHNOLOGYCartridge Filtration (10 & 5 µm) → HP Pumps → Pressure Vessels → Nano-Filtration MembranesLOCATIONKhurais (250 km SW of Dhahran)

A portable nano-filtration plant removing sulphate from oilfield produced water at 9,000 m³/day, started up in October 2016. The skid-mounted design mobilizes quickly and runs under PLC with 24/7 online monitoring of flow, sulphate, SDi, turbidity, and pressure.

Sulphate removal from produced water
Portable, skid-mounted for fast mobilization
PLC & VFD control with field instrumentation
View project
Industrial WWTP2021
Self-Cleaning Strainers — Ain Dar SRF Plant

Self-Cleaning Strainers — Ain Dar SRF Plant

CLIENTSaudi AramcoCAPACITY92,000 m³/dayTECHNOLOGYAutomatic SCS 100 µm → Automatic SCS 50 µm → Microprocessor DPS auto-backwashLOCATIONAin Dar Sulphate Removal Facility

Automatic self-cleaning strainers for the seawater pre-filtration system of the Sulphate Removal Plant, eliminating the heavy cartridge-filter replacement downtime. Two-stage 100 µm + 50 µm filtration with SS-316 sintered screens and a special seawater-duty coating.

Eliminates manual cartridge-filter downtime
Two-stage 100 µm + 50 µm filtration
SS-316 with seawater-duty corrosion coating
View project
Industrial WWTP2025
Self-Cleaning Strainers — Ain Dar SRF Plant (V1 Expansion)

Self-Cleaning Strainers — Ain Dar SRF Plant (V1 Expansion)

CLIENTSaudi AramcoCAPACITY92,000 m³/dayTECHNOLOGYAutomatic SCS 100 µm → Automatic SCS 50 µm (6-train) → Microprocessor DPS auto-backwashLOCATIONAin Dar Sulphate Removal Facility

A 2025–2028 expansion of the Ain Dar self-cleaning strainer scheme, adding an expanded six-train 50 µm configuration with microprocessor differential-pressure auto-backwash and SS-316 marine-grade construction for continuous high-volume seawater pre-filtration.

Expanded six-train 50 µm configuration
Differential-pressure triggered auto-backwash
SS-316 marine corrosion-resistant build
View project
Industrial WWTP2024
Wastewater Treatment Facilities SDS 1 — Jizan Refinery

Wastewater Treatment Facilities SDS 1 — Jizan Refinery

CLIENTSaudi AramcoCAPACITY30,000 m³ (Tank D-0101)TECHNOLOGYCyclone Oil-Water Separator → DAF → Multi-Media Filter → Sulfide Scavenger → Activated CarbonLOCATIONJizan Refinery, Red Sea coast

Supply, installation, and operation of a facility to remove sulphides from ~30,000 m³ of accumulated sour water in Tank D-0101, cutting sulphide from ~8,000 ppm to under 1 ppm to meet Jazan WWTP discharge limits.

Sulphide cut from ~8,000 ppm to <1 ppm
Cyclone oil-water separation + DAF
Activated carbon for H₂S odour capture
View project
Industrial WWTP2024
Wastewater Treatment Facilities SDS 2 — Jizan Refinery

Wastewater Treatment Facilities SDS 2 — Jizan Refinery

CLIENTSaudi AramcoCAPACITY100 m³/hr (275,000 m³ total)TECHNOLOGYCyclone Oil-Water Separator → DAF → Multi-Media Filter → Sulfide Scavenger → Activated CarbonLOCATIONJizan Refinery, Red Sea coast

A higher-capacity treatment system for pretreated wastewater from Basins A and B, handling up to 100 m³/hr to bring it within the refinery WWTP inflow-quality requirements, supplied as a complete pipelines-and-instrumentation system.

High-flow cyclone oil-water separation at 100 m³/hr
DAF + multi-media polishing
Complete pipelines & instrumentation package
View project
Industrial WWTP2024
Temporary Portable RO & EDI Units — Jizan Refinery

Temporary Portable RO & EDI Units — Jizan Refinery

CLIENTSaudi AramcoCAPACITY2,200 m³/d utility + 4,100 m³/d deminTECHNOLOGYSWRO Desalination → BWRO Polishing → EDI DeionizationLOCATIONJizan Refinery, Red Sea coast

Supply and installation of temporary portable RO/EDI units supporting the Jizan Refinery 2024 shutdown — six SWRO units making utility water and one BWRO unit feeding eighteen EDI units that produce high-purity demineralized water.

Six SWRO units for utility water
18 EDI units for high-purity demin water
Antiscalant & anti-biofouling dosing
View project
Sanitary / Municipal2022
Sanitary Wastewater Treatment Plant BOO — Tanajib Marine

Sanitary Wastewater Treatment Plant BOO — Tanajib Marine

CLIENTSaudi AramcoCAPACITY5,400 m³/dayTECHNOLOGYScreening → Grit & Grease Trap → Aeration → MBR Filtration → Sludge Drying BedsLOCATIONTanajib Marine Facilities

An upgrade to the existing unit, receiving tanker-truck domestic wastewater from Tanajib Marine Facilities and treating 5,400 m³/day to discharge standard via MBR. FKP delivered all civil and mechanical works, treated-water and sludge storage, and drying beds, running on PLC with 24/7 monitoring.

MBR effluent meeting discharge standards
Screening + grit/FOG pre-treatment
Five 120 kW generators with synchronization panel
View project
Industrial WWTP2025
H₂S Seawater Treatment — 30" MJTNG-1 Pipeline

H₂S Seawater Treatment — 30" MJTNG-1 Pipeline

CLIENTSaudi AramcoCAPACITY500 m³/hr (40,000 m³ total)TECHNOLOGYDAF Coagulation → Multi-Media Filtration → Sulfide Scavenger Dosing → Activated CarbonLOCATIONMarjan Offshore Field, Arabian Gulf

A treatment system removing sulphides from seawater used to dewater the 30" MJTNG-1 pipeline. DAF, sulphide-scavenger dosing, and activated-carbon units capture H₂S and control odour, processing 40,000 m³ at 500 m³/hr.

DAF + multi-media for TSS to marine standard
Sulphide-scavenger chemical dosing
Activated carbon for residual H₂S capture
View project
Industrial WWTP2025
H₂S Seawater Treatment — 42" MJTNG-1 Pipeline

H₂S Seawater Treatment — 42" MJTNG-1 Pipeline

CLIENTSaudi AramcoCAPACITY1,000 m³/hr (50,000 m³ total)TECHNOLOGYDosing Pumps → Sulfide Scavenger → Chemical Injection → Activated CarbonLOCATIONMarjan Offshore Field, Arabian Gulf

An integrated high-capacity dosing system for sulphide treatment of seawater used to flood the 42" MJTNG-1 pipeline, processing 50,000 m³ at 1,000 m³/hr with a full on-site laboratory for continuous sulphide monitoring throughout the flooding procedure.

High-capacity dosing at 1,000 m³/hr
On-site lab for continuous sulphide monitoring
Activated carbon for odour control
View project
Industrial WWTP2023
Containerized Oily-Water Treatment — Duba & Tabuk Bulk Plant

Containerized Oily-Water Treatment — Duba & Tabuk Bulk Plant

CLIENTSaudi Aramco (Rawabi Butec)CAPACITY2,000 m³/dayTECHNOLOGYGravity Oil-Water Separator → DAF → Sand Filter → Cartridge Filtration → UltrafiltrationLOCATIONDuba Bulk Plant, northern Saudi Arabia

When a new sump at Duba Bulk Plant seeped oily water into the excavation, FKP delivered a containerized modular plant — assembled in standard 40-foot containers for rapid deployment — to treat the industrial oily water safely for marine discharge.

Containerized modular plant in 40-ft units
Gravity separation + DAF for oil removal
Sand, cartridge & ultrafiltration polishing
View project
Sanitary / Municipal2019
King Fahad Causeway MBBR Sewage Treatment Plant

King Fahad Causeway MBBR Sewage Treatment Plant

CLIENTKing Fahad Causeway Authority (KFCA)CAPACITY2 × 500 m³/dayTECHNOLOGYGrit & Grease Pre-treatment → MBBR Biological Reactor → Sand Filtration → Chemical DisinfectionLOCATIONKing Fahad Causeway (Saudi & Bahrain)

Complete supply and installation of MBBR sewage treatment plants for both the Saudi and Bahraini sides of the causeway, meeting each country’s discharge standards with stable biological treatment under varying loads and automated PLC control with odour management.

MBBR for efficient BOD/COD/TSS reduction
Serves Saudi & Bahraini border facilities
Automated PLC control with odour management
View project
Operation & Maintenance2015
WWT Plant O&M — Khursaniyah Gas Plant (KGP)

WWT Plant O&M — Khursaniyah Gas Plant (KGP)

CLIENTSaudi AramcoCAPACITY233 m³/dayTECHNOLOGYOily Water Treatment → Membrane Bioreactor (MBR) → SAES-104 Irrigation StandardLOCATIONKhursaniyah Gas Plant (KGP)

A multi-year O&M contract (2015–2017) operating the KGP wastewater facility, treating both oily and sanitary wastewater via MBR with effluent meeting Saudi Aramco SAES-104 irrigation-water specifications, including monitoring and maintenance.

MBR sanitary + oily-water treatment
Effluent meeting SAES-104 irrigation specs
Effluent-quality monitoring & maintenance
View project
Operation & Maintenance
Abu Arish Sewage Treatment Plant O&M

Abu Arish Sewage Treatment Plant O&M

CLIENTJazan MunicipalityCAPACITY1,000 m³/dayTECHNOLOGYScreening → Grit Removal → Lift Station → Aeration → MBR → Sludge DryingLOCATIONAbu Arish, Jazan Province

Operation and maintenance of a 1,000 m³/day MBR municipal plant treating tanker-discharge wastewater from the Abu Arish community, using fine-bubble aeration and membrane bioreactor technology under full PLC automation.

MBR with fine-bubble aeration
Full screening, grit & sludge handling
PLC automated operation & maintenance
View project
Industrial WWTP2021
Containerized Water Treatment Pilot Plant — JTTF R&D I

Containerized Water Treatment Pilot Plant — JTTF R&D I

CLIENTSaudi Aramco R&DCAPACITY25 m³/dayTECHNOLOGYNano-Filtration · DAF · RSL Membrane · Cyclone OWS · Constructed Wetland (parallel streams)LOCATIONJTTF (Juaymah) R&D facility

A containerized pilot plant operated to test multiple produced-water treatment technologies in parallel under real field conditions, supporting selection and optimization of the best full-scale solution for JTTF evaporation-pond water.

Multiple technologies tested in parallel
Nano-filtration for sulphate removal
Constructed wetland for heavy-metal removal
View project
Industrial WWTP2023
Relocating Water Treatment Pilot Plant — JTTF R&D II

Relocating Water Treatment Pilot Plant — JTTF R&D II

CLIENTSaudi Aramco R&DCAPACITY25 m³/dayTECHNOLOGYNano-Filtration → RSL Membrane · Constructed Wetland · DAF → Cyclone OWS (three streams)LOCATIONJTTF (Juaymah) R&D facility

A relocated and redesigned pilot plant testing produced-water treatment across three parallel streams — constructed wetland, conventional oily-wastewater, and RSL membrane — as a controlled platform to assess performance and reliability for full-scale selection.

Three parallel treatment streams
Relocatable for flexible field trials
RSL membrane for TSS reduction in oily water
View project
09 / Partners & clients

Who we build with.

Engineering partners

Specialist process design and independent engineering review behind the plants we sign off.

IE-Consult
Engineering & process design partner

Independent detailed design and engineering review.

W-Tech Co.
Technology & systems partner

Process technology and specialist systems supply.

Principal clients

Organisations that have entrusted FKP with water and wastewater works.

Saudi Aramco
King Fahad Causeway Authority
Jazan Municipality
10 / Contact

Tell us what you need treated.

Send the influent, the flow, and the standard you must meet. We respond with an indicative scope within one business day.

Fields marked * are required.