WWT Plant O&M — Khursaniyah Gas Plant (KGP)
Two and a half years operating and maintaining an MBR-based oily-water and sanitary treatment plant at Khursaniyah Gas Plant, holding effluent to Saudi Aramco SAES-104 irrigation standard.
A multi-year O&M contract (2015–2017) operating the KGP wastewater facility, treating both oily and sanitary wastewater via MBR with effluent meeting Saudi Aramco SAES-104 irrigation-water specifications, including monitoring and maintenance.
FK & Partner Co. ran the facility under an O&M contract from February 2015 to July 2017, treating both oily process water and sanitary wastewater (233 CMD) and monitoring effluent against SAES-104. Water Technology Company (W-Tech) was the technical partner and IE-Consult the consultant.
A live gas plant produces both oily process water and sanitary sewage that must be treated continuously to a strict irrigation-reuse standard — with no room for downtime on an operating Aramco facility.
- Effluent must meet SAES-104 irrigation specs
- Continuous operation — no treatment interruption
- Two streams: oily process water + sanitary
A treatment train sequenced to the contaminants.
FK & Partner Co. provided full operation, preventive maintenance, and laboratory monitoring of the existing MBR plant, keeping the membrane bioreactor and oily-water units within spec and documenting effluent quality against SAES-104 throughout the contract.
| Equipment / parameter | Application / value |
|---|---|
| Technology | Membrane bioreactor (MBR) |
| Standard | SAES-104 irrigation |
| Contract period | 2015–2017 |
| Capacity | 233 m³/day |
| Capacity | 233 m³/day |
| Project type | Long-term O&M contract |
MBR sanitary + oily-water treatment
Effluent meeting SAES-104 irrigation specs
Effluent-quality monitoring & maintenance
Verified post-commissioning performance figures (achieved effluent, throughput, uptime) to be confirmed — see CONTENT_GAPS.