Operation & Maintenance Date to be confirmed Jazan Municipality

Abu Arish Sewage Treatment Plant O&M

Operation and maintenance of a 1,000 m³/day MBR municipal plant treating tanker-discharge wastewater from the Abu Arish community for Jazan Municipality.

Abu Arish Sewage Treatment Plant O&M
Capacity
1,000 m³/day
Technology
Screening → Grit Removal → Lift Station → Aeration → MBR → Sludge Drying
Timeline
Date to be confirmed
Project type
Municipal STP — operation & maintenance
Executive summary

Operation and maintenance of a 1,000 m³/day MBR municipal plant treating tanker-discharge wastewater from the Abu Arish community, using fine-bubble aeration and membrane bioreactor technology under full PLC automation.

FK & Partner Co. operates and maintains the complete facility — screening, grit removal, lift station, fine-bubble aeration, membrane bioreactor, storage, and sludge drying beds — under full PLC automation.

The challenge

A municipal community’s tanker-discharged sewage needed reliable MBR treatment and ongoing operation to a consistent standard, with the municipality as client.

Site & process constraints
  • Tanker-discharged municipal sewage
  • Reuse-grade MBR effluent
  • Continuous O&M obligation
Engineering approach

A treatment train sequenced to the contaminants.

Screening → Grit Removal → Lift Station → Aeration → MBR → Sludge Drying

Screening and aerated grit removal pre-treat; submersible pumps lift to fine-bubble aeration; a membrane bioreactor produces high-quality effluent; sludge drying beds dewater biosolids — all PLC-automated and operated and maintained by FKP.

Compact MBR: a small footprint suited to a community plant, run under O&M.
Technical specifications
Equipment & key parameters (from the project scope)
Equipment / parameterApplication / value
MBR SystemMembrane bioreactor
Pre-treatmentScreening + grit
ControlPLC auto-control
Capacity1,000 m³/day
Capacity1,000 m³/day
Project typeMunicipal STP — operation & maintenance
Implementation
O&M
Operated and maintained for Jazan Municipality (dates to confirm).
Results & outcomes

MBR with fine-bubble aeration

Full screening, grit & sludge handling

PLC automated operation & maintenance

Verified post-commissioning performance figures (achieved effluent, throughput, uptime) to be confirmed — see CONTENT_GAPS.

Project gallery
Related projects

Interested in something similar?

Tell us your influent, flow, and the standard you must meet — we'll respond with an indicative scope within one business day.

Discuss a similar project