Operation & Maintenance Nov 2023 – Dec 2025 Saudi Aramco R&D

Relocating Water Treatment Pilot Plant — JTTF R&D II

A relocated and redesigned R&D pilot at Juaymah running three parallel produced-water streams — constructed wetland, conventional oily wastewater, and RSL membrane. A pilot programme, transparently labelled.

Relocating Water Treatment Pilot Plant — JTTF R&D II
Capacity
25 m³/day
Technology
Nano-Filtration → RSL Membrane · Constructed Wetland · DAF → Cyclone OWS (three streams)
Timeline
Nov 2023 – Dec 2025
Project type
Pilot plant — relocated & redesigned
Executive summary

A relocated and redesigned pilot plant testing produced-water treatment across three parallel streams — constructed wetland, conventional oily-wastewater, and RSL membrane — as a controlled platform to assess performance and reliability for full-scale selection.

FK & Partner Co. delivered the complete design, installation, and commissioning, then operated the 25 m³/day pilot to assess performance, reliability, and treatment efficiency for full-scale selection.

The challenge

Continue the produced-water technology evaluation on a relocatable platform, structured into three distinct treatment streams for clearer comparison.

Site & process constraints
  • Three parallel streams to compare
  • Relocatable for flexible field trials
  • Pilot scale — 25 m³/day
Engineering approach

A treatment train sequenced to the contaminants.

Nano-Filtration → RSL Membrane · Constructed Wetland · DAF → Cyclone OWS (three streams)

Stream one is a constructed-wetland pilot; stream two conventional oily-wastewater treatment with cyclone OWS and de-oiler; stream three RSL membranes for TSS reduction, with nano-filtration for sulfate removal across the platform.

Relocatable design: the pilot can move between sites as R&D priorities shift.
Technical specifications
Equipment & key parameters (from the project scope)
Equipment / parameterApplication / value
Nano-FiltrationSulphate removal
Constructed WetlandHeavy-metal removal
RSL MembraneTSS reduction
Capacity25 m³/day
Capacity25 m³/day
Project typePilot plant — relocated & redesigned
Implementation
Nov 2023
Relocated pilot installed and commissioned.
Dec 2025
Programme period concludes.
Results & outcomes

Three parallel treatment streams

Relocatable for flexible field trials

RSL membrane for TSS reduction in oily water

Verified post-commissioning performance figures (achieved effluent, throughput, uptime) to be confirmed — see CONTENT_GAPS.