Sanitary / Municipal Nov 2019 – Dec 2021 King Fahad Causeway Authority (KFCA)

King Fahad Causeway MBBR Sewage Treatment Plant

A complete MBBR sewage treatment plant serving both the Saudi and Bahraini sides of the King Fahad Causeway — 2 × 500 m³/day, meeting each country’s discharge standards.

King Fahad Causeway MBBR Sewage Treatment Plant
Capacity
2 × 500 m³/day
Technology
Grit & Grease Pre-treatment → MBBR Biological Reactor → Sand Filtration → Chemical Disinfection
Timeline
Nov 2019 – Dec 2021
Project type
Supply & install MBBR STP
Executive summary

Complete supply and installation of MBBR sewage treatment plants for both the Saudi and Bahraini sides of the causeway, meeting each country’s discharge standards with stable biological treatment under varying loads and automated PLC control with odour management.

The King Fahad Causeway is a 25 km sea-bridge between Al-Khobar and Al Jasra, managed by KFCA. FK & Partner Co. handled supply, installation, testing, and commissioning of the MBBR plant treating domestic wastewater from staff and administrative facilities on both sides; IE-Consult led the design.

The challenge

A single plant had to serve facilities on both sides of an international border and satisfy two countries’ discharge standards, with stable performance under fluctuating hydraulic and organic loads.

Site & process constraints
  • Two countries’ discharge standards
  • Fluctuating hydraulic & organic loads
  • Border-facility reliability
Engineering approach

A treatment train sequenced to the contaminants.

Grit & Grease Pre-treatment → MBBR Biological Reactor → Sand Filtration → Chemical Disinfection

Grit & grease pre-treatment protects the process; an MBBR biofilm reactor gives high-efficiency BOD/COD/TSS reduction resilient to load swings; sand filters and chemical disinfection finish for safe discharge; an odour unit and PLC auto-control complete the plant (2 × 500 m³/day).

MBBR for load resilience: biofilm process holds performance under variable causeway loads.
Technical specifications
Equipment & key parameters (from the project scope)
Equipment / parameterApplication / value
MBBR UnitOrganic-matter removal
Pre-treatmentGrit & grease
DisinfectionChemical dosing
Total capacity2 × 500 m³/day
Capacity2 × 500 m³/day
Project typeSupply & install MBBR STP
Implementation
Nov 2019
Supply & installation commenced.
Dec 2021
Testing & commissioning completed for both sides.
Results & outcomes

MBBR for efficient BOD/COD/TSS reduction

Serves Saudi & Bahraini border facilities

Automated PLC control with odour management

Verified post-commissioning performance figures (achieved effluent, throughput, uptime) to be confirmed — see CONTENT_GAPS.

Project gallery