Temporary Portable RO & EDI Units — Jizan Refinery
Temporary portable RO and EDI units supporting the Jizan Refinery 2024 shutdown — 2,200 m³/day of utility water and 4,100 m³/day of demineralized water.
Supply and installation of temporary portable RO/EDI units supporting the Jizan Refinery 2024 shutdown — six SWRO units making utility water and one BWRO unit feeding eighteen EDI units that produce high-purity demineralized water.
FK & Partner Co. supplied and installed six SWRO units and one BWRO unit with multimedia pretreatment, antiscalant and anti-biofouling dosing, and high-pressure/booster pumps, plus 18 EDI units producing high-purity demineralized water — with all certified manpower, tools, and consumables for the shutdown.
A planned 2024 refinery shutdown needed a temporary, fully portable supply of both utility water and high-purity demineralized water, complete with manpower and consumables, on a fixed schedule.
- Temporary, fully portable supply
- Two grades: utility + demineralized
- Fixed shutdown schedule
A treatment train sequenced to the contaminants.
Six SWRO units desalinate to utility-water grade; one BWRO unit polishes feed for the EDI stage; 18 EDI units then deliver high-purity demineralized water — protected by multimedia pretreatment and antiscalant/anti-biofouling dosing.
| Equipment / parameter | Application / value |
|---|---|
| SWRO Units | 6 (utility water) |
| BWRO Unit | 1 (EDI feed) |
| EDI Units | 18 (demin water) |
| Capacity | 2,200 + 4,100 m³/day |
| Capacity | 2,200 m³/d utility + 4,100 m³/d demin |
| Project type | Temporary portable RO/EDI (shutdown support) |
Six SWRO units for utility water
18 EDI units for high-purity demin water
Antiscalant & anti-biofouling dosing
Verified post-commissioning performance figures (achieved effluent, throughput, uptime) to be confirmed — see CONTENT_GAPS.
Interested in something similar?
Tell us your influent, flow, and the standard you must meet — we'll respond with an indicative scope within one business day.
Discuss a similar project