Industrial WWTP Dec 2024 – Mar 2025 Saudi Aramco

Temporary Portable RO & EDI Units — Jizan Refinery

Temporary portable RO and EDI units supporting the Jizan Refinery 2024 shutdown — 2,200 m³/day of utility water and 4,100 m³/day of demineralized water.

Temporary Portable RO & EDI Units — Jizan Refinery
Capacity
2,200 m³/d utility + 4,100 m³/d demin
Technology
SWRO Desalination → BWRO Polishing → EDI Deionization
Timeline
Dec 2024 – Mar 2025
Project type
Temporary portable RO/EDI (shutdown support)
Executive summary

Supply and installation of temporary portable RO/EDI units supporting the Jizan Refinery 2024 shutdown — six SWRO units making utility water and one BWRO unit feeding eighteen EDI units that produce high-purity demineralized water.

FK & Partner Co. supplied and installed six SWRO units and one BWRO unit with multimedia pretreatment, antiscalant and anti-biofouling dosing, and high-pressure/booster pumps, plus 18 EDI units producing high-purity demineralized water — with all certified manpower, tools, and consumables for the shutdown.

The challenge

A planned 2024 refinery shutdown needed a temporary, fully portable supply of both utility water and high-purity demineralized water, complete with manpower and consumables, on a fixed schedule.

Site & process constraints
  • Temporary, fully portable supply
  • Two grades: utility + demineralized
  • Fixed shutdown schedule
Engineering approach

A treatment train sequenced to the contaminants.

SWRO Desalination → BWRO Polishing → EDI Deionization

Six SWRO units desalinate to utility-water grade; one BWRO unit polishes feed for the EDI stage; 18 EDI units then deliver high-purity demineralized water — protected by multimedia pretreatment and antiscalant/anti-biofouling dosing.

Two-stage membrane + EDI: SWRO→BWRO→EDI reaches demineralized purity from seawater feed.
Technical specifications
Equipment & key parameters (from the project scope)
Equipment / parameterApplication / value
SWRO Units6 (utility water)
BWRO Unit1 (EDI feed)
EDI Units18 (demin water)
Capacity2,200 + 4,100 m³/day
Capacity2,200 m³/d utility + 4,100 m³/d demin
Project typeTemporary portable RO/EDI (shutdown support)
Implementation
Dec 2024
Portable RO/EDI mobilised for the shutdown.
Mar 2025
Shutdown support concluded.
Results & outcomes

Six SWRO units for utility water

18 EDI units for high-purity demin water

Antiscalant & anti-biofouling dosing

Verified post-commissioning performance figures (achieved effluent, throughput, uptime) to be confirmed — see CONTENT_GAPS.