Get in Touch
  Client: Saudi Aramco R&D  ·  Nov 2023 - Dec 2025

Relocating Water Treatment Pilot Plant — JTTF R&D II, Saudi Aramco

About R&D Juaymah

The R&D department at JTTF, Saudi Aramco, maintains an evaporation pond containing produced water requiring treatment. R&D intends to evaluate various treatment technologies by conducting pilot-scale testing using a dedicated pilot plant.

R&D Pilot Plant Phase II — Relocation

A pilot plant was designed, installed, and operated to enable comprehensive testing of multiple produced water treatment technologies. The pilot facility serves as a controlled platform for assessing the performance, reliability, operational requirements, and treatment efficiency of each technology under real field conditions. The outcomes of this pilot program will support the selection and optimization of the most suitable full-scale treatment solution for the evaporation pond water at JTTF.

Scope of Work

FK & Partner Co. provided complete design, installation, commissioning, and startup for the entire relocated pilot plant.

Technologies were evaluated in three parallel streams: Constructed Wetland, Conventional Oily Wastewater, and RSL Membrane.

All results contribute to Saudi Aramco full-scale treatment selection.

Relocating Water Treatment Pilot Plant — JTTF R&D II
 Technologies Tested
Equipment / ParameterApplication / Value
Nano FiltrationSulfate removal
Constructed WetlandHeavy metal removal
DAFCoagulation / Flocculation
Cyclone OWSOil-water separation
De-OilerOil-water separation
RSL MembranesTSS removal
Capacity25 M3/Day
Capabilities

Technologies Evaluated

 Nano Filtration for sulfate removal from produced water
 Constructed Wetland pilot for heavy metal removal
 Dissolved Air Flotation for coagulation and flocculation
 Cyclone Oil-Water Separator for oily produced water
 De-Oiler systems for enhanced oil-water separation
 RSL Membrane filtration for TSS reduction in oily wastewater
Relocating Water Treatment Pilot Plant — JTTF R&D II