Duba & Tabuk Bulk Plant — Containerized Oily Water Treatment
A newly constructed sump (11m x 8m x 6.5m) by Rawabi Butec at Duba Bulk Plant (DBP) — Saudi Aramco, experienced oily water seep into the excavation at a depth of about 3 m. Therefore, an urgent solution was needed to treat this oily water and meet Government Regulation before marine disposal.
Innovative Engineering Consulting (IE-Consult) office, an affiliate of FK & Partner Co. (FKP), proposed a containerized modular water treatment plant solution for safe and efficient treatment of the DBP industrial oily water for discharge to the marine environment. Water Tech Co. for Environmental Services (W-Tech Co) fully assembled the treatment plant in standard 40ft containers.
FKP & IE-Consult: Water quality analysis, technical proposal, plant design, equipment supply, piping, electrical, civil work, commissioning and startup.
W-Tech Co.: Fiberglass oil separator construction, process tanks, pump skids, and containerized treatment plant assembly.
| Equipment / Parameter | Application / Value |
|---|---|
| 40 ft Containers | 3 units — plant housing |
| Gravity Oil-Water Separator | 3 x 50 m3/hr |
| Dissolved Air Flotation (DAF) | 3 x 50 m3/hr |
| FRP Sand Filter | 3 x 50 m3/hr |
| Cartridge Filtration Skid | 3 x 50 m3/hr |
| Ultra Filtration Modules | 1 x 75 m3/hr |
| Pump Skids | 4 units |
| Local Control Panels | 4 units |
| Sludge Removal | 1 unit |
| Capacity | 2,000 M3/Day |
Treatment Process Stages