Sanitary Wastewater Treatment Plant BOO at Tanajib Marine — Saudi Aramco
An upgrade to the existing wastewater treatment unit was required. The WWTP/STP is designed to receive domestic wastewater delivered by tanker trucks from the Tanajib Marine Facilities for treatment.
FK & Partner Co. provided all the civil and mechanical work, storage tanks for treated water and sludge, including drying beds for sludge dewatering that complete the treatment. The entire plant is operated by PLC and observed through an online monitoring system 24h x 7d.
IE-Consult provided complete design, engineering solution, and project management for installation and commissioning.
FK & Partner Co. provided all civil and mechanical work, storage tanks, drying beds for sludge dewatering.
The entire plant is operated by PLC with 24/7 online monitoring.
| Equipment / Parameter | Application / Value |
|---|---|
| Screen | Screening removal |
| Grit & Grease Trap | Sand & FOG removal |
| Pumps | Flow control & service water |
| Mixer & Aeration System | Biological treatment |
| MBR Package Plants | Filtration |
| Blower | Aeration and scouring |
| Instruments | Flow, Level, TSS, DO, Pressure |
| Control Panel & PLC | Complete auto-control |
| Sludge Removal | Sludge drying beds |
| Generators | Five (120 kW) with synchronization switchboard |
| Capacity | 5,400 M3/Day |
Treatment System Capabilities