Get in Touch
  Client: Saudi Aramco  ·  Feb 2025 - May 2025

H2S Contaminated Seawater Treatment — 30" MJTNG-1 Pipeline, Tanajib

About Marjan Offshore Field

The Marjan offshore oil and gas field in the Arabian Gulf near Tanajib is one of Saudi Aramco's key offshore assets, undergoing major expansion to increase crude oil, gas, and NGL production through new platforms, pipelines, and processing facilities.

Sulfide Treatment — MJTNG-1 Dewatering

Supply, installation, and operation of a treatment system to remove sulfides from seawater used for dewatering the 30" MJTNG-1 pipeline. FK & Partner Co. and W-Tech Co. installed a DAF unit, sulfide scavenger dosing system, and activated carbon units for H2S capture. Total: 40,000 m3 at 500 m3/hr.

Scope of Work

IE-Consult provided complete design, engineering solution, and project management.

FK & Partner Co. & W-Tech Co. supplied and installed DAF, sulfide scavenger dosing, activated carbon units, and all pipelines and instrumentation.

H2S Contaminated Seawater Treatment — Tanajib 1
 Equipment Specifications
Equipment / ParameterApplication / Value
DAFCoagulation / Floatation
MM FilterTSS removal
Sulfide Scavenger Dosing SystemSulfide treatment of seawater
Activated CarbonOdor control — H2S capture
Pipeline30" MJTNG-1 trunk line
Flow Rate500 m3/hr
Total Volume40,000 m3
Capabilities

System Capabilities

 DAF for suspended solids removal from pipeline dewatering seawater
 Multi-media filtration for TSS polishing to marine discharge standards
 Sulfide scavenger chemical dosing for H2S neutralization
 Activated carbon for odor control and residual H2S gas capture
 500 m³/hr capacity treating 40,000 m³ total volume
 Treatment system for dewatering the MJTNG-1 pipeline
H2S Contaminated Seawater Treatment — Tanajib 1